Three parts…

The venue where the Antakya Christian Church gathers is a rented former courtyard house in the oldest part of the city of Antakya. It is not overly large – but we’ve been gathering in this location for over ten years now and, well, it feels like home.

It is known in the immediate community, and over the years, many have come and visited with us there, sharing in our special occasions, Easter and Christmas and many other events.

But it is rented. The rent, as rents do, continues to increase year on year. In the beginning, the fellowship was able to meet the rent. However, over the years, we’ve passed the point where the believers are able to do so; every month there is now a short fall.

In former times, the landlord, a Turkish, ‘Greek Orthodox’ gentlemen whose house is adjacent, would provide his large garden and its most important feature, in the midst of his garden, a large water feature for Fellowship baptisms. It was within this water feature that a number of believers have been baptised.

Sadly, our landlord has passed-on and with his passing, so has passed the opportunity to use his ‘water feature’ as our impromptu baptismal pool.

Recently, a brother declared his desire to obey the Lord in the waters of baptism and that raised the question of where were we to do this?

In the past, in addition to the landlord’s water feature we have conducted baptisms in the Mediterranean Sea. The sea sounds like a idyllic place to be baptised, but the reality is, it is over thirty kilometres away and large sections of the beach are subject to a vicious rip-tide. Added to this is the complication of transporting everyone who would like to be there to the baptismal location, thirty or more kilometres there and naturally, another thirty or so kilometres back. A local venue is our clear preference.

As it is our understanding and practice that baptism is by immersion; a bucket or font does not fill the bill.

One possible solution was to construct a ‘water feature’, that is a baptismal pool, at the building we rent for the church, but:

• we are renters – we may have to move at some time in the future

• the property is small, and to put an adequately sized ‘water feature’ in the stone clad courtyard would dominate the courtyard to such an extent that it would impede our fellowship times, fellowship meals, and the children’s work

• we can not built the baptismal pool indoors as, well, there really isn’t any space to do so within the church building.

And so was born the notion of building a ‘water feature’ in the courtyard of our home, which belonging to the elder and will always be available for our use, and use it for Fellowship baptisms. Our courtyard is larger, and whilst the Baptismal Pool will dominate it, it would not impede the activities that occur in the courtyard.

So, we embraced this solution with the desire to have it built and established quickly to enable our brother to be baptised.

Two young people from the United Kingdom came down to help with the refugee ministry and, they declared, in any way they could be of a help.

We took them at their word.

They helped with the refugee work. They helped with the children’s work. And they helped with this baptismal pool project.

We felt that if we built the baptismal pool on top of the courtyard floor and with it being deep enough for a baptism, it would stand rather tall – too tall. Consequently, it was decided that we would drop the bottom of the pool lower than the courtyard floor. In this way, with part of the pool below the level of the courtyard, less would be required to stand proud – the required depth would be created without being too high in the courtyard.

To go lower than the courtyard required breaking open the floor and digging down sixty odd centimetres. This was no mean task.

Digging the pit is a task in and of itself, but it is not just the digging, but also the bagging up of the spoil and then lugging it out of the way, that makes this such a laborious task. With over one and a half cubic meters of compressed soil, broken up and dumped into bags, this equated to a disproportionately large number of bags.

The need to dispose of all the bags was a constant pressure dogging me. It is not enough to create the hole, it was not enough to bag the spoil, at some point it would need to be dragged, lugged, cajoled or otherwise removed from the courtyard and loaded (let the reader understand ‘lifted’, hoisted, manhandled) up into a lorry for transportation and disposal… somewhere.

The courtyard tiles were carefully lifted and cleaned as they were needed elsewhere, and our two, hearty and hail young people threw themselves at the task of excavating the hole.

Slowly, layer by layer, the pit, about 1.70 meters by 1.86 meters rectangle, was excavated. Beneath the courtyard tiles there was a sand layer of about five to seven centimetres deep – we bagged this relatively clean sand up separately as we felt it may be required later in the build (it was). The sand had been laid over a compacted layer of stones. Together this formed the base of the current courtyard tiles. Below this, as we dug deeper, we passed through various levels until, at about 60 centimetres down, we encountered an old level surface. This appeared to be constructed of cement, so, it would not be really old. As this was at about out desired depth, we stopped excavating.

I confess, it was rather satisfying to look down and see a smooth, flat bottom to the pit.

However, it was less than satisfying to look all around at the bags and bags and bags of spoil. All the bags were hand filled.  Some were on the light side, easy to shift, and others were beyond my ability to shift without extreme difficulty.

It was important that the sides of the hole be perpendicular and we did work at it to ensure they were so. And, to a degree, they were… to a degree… but, in reality, they really were not.

The young people, having expended their energies and sweat, returned to the country from whence they came and the labour baton was passed to a Turkish workman who does this sort of rough construction – forms, hand mixed cement, block walls and such.

He informed me that he had experience in this kind of thing, that he had made a large pool for his children and their friends to romp around in and it has never leaked.

I found that very encouraging.

He convinced me that he was the one to do the task and besides, I dreaded the notion of mixing a lot of cement by hand, and I have no real experience laying blocks.

Before he began his task of pouring a floor in the pit and building the sides, he jumped in the hole and measured the top and the bottom of the hole. He then declared that the top was larger than the bottom. True, my eye, which is not very accurate, did note a discrepancy.  His measured discrepancy was significant – accumulative over two sides was about 15 centimetres, on the one axis and the same on the other axis.

Now that is a large discrepancy, about seven centimetres per side.

In my ignorance, I thought he would trim the sides of the pit, creating more spoil, and make them truly perpendicular; that this approach would be easier, better, and result in a stronger structure.

I assumed he would make the bottom measurements the same as the top, with straight, perpendicular sides, and that then he would pour the floor and then build the walls.

The measurements at the top of the pit are true, framed by the courtyard tiles. To make the sides right it would mean excavating the bottom reaches of the sides to extract the excess soil – I acknowledge that this would be an added task, but I did not perceive that this was an overly taxing or difficult task.

Alas, no…

His first chosen task was to ignore the wonky sides and dig a hole in a corner to accommodate the sump pump. A sump pump was required as we could not put a drain in, partly because of the depth and mostly because we did not want to tear up any more of the courtyard tiles than necessary.

Leaving the sides as they were, his next task was to cut and put some steel rods in the bottom of the hole and then to hand-mix sand and gravel and cement in a pile on the floor of the courtyard. The idea is you roughly turn the pile over and in so doing, you mix the cement into the sand and gravel. Then you make a depression in the middle of the pile with walls formed out of the sand, gravel and cement, creating a lake-like basin. This space is then flooded with water.

Once sufficient water has pooled in the ‘lake’, you carefully chop slices off the interior side of the walls, that is the walls which are all there is holding the water in. These delicate slices of sand, cement and gravel are drawn into the centre and mixed with the water.

Thus, in this manner, slowly, slowly, the original dry pile, has been turned over and flooded and mixed until it is a large sloppy, soupy mixture on the floor of the courtyard.

To cement the sump pump depression, he first, carefully, put some of this cement mixture in the bottom of the newly excavated hole and then placed an old paint pail on top of the concrete. He then poured the cement around the sides. In this way, it would be encased in cement – the plastic paint pail would remain in-situ and provide the venue for the sump pump.

Then the remainder of the cement mixture was poured, pushed and coaxed so as to fill the bottom of the hole, carefully lifting the steel bars off the floor of the pit in the process.

This task being done, he departed.

On the following day with the cement now set, our rough builder set about building the walls of our Baptismal pool.

I did wonder if he would just make the pool smaller, using the bottom width of the pool his guide and build the walls straight up from there. This would result in a smaller pool and a gap between the tiles and the wall.

That was not his plan…

The constructing of these walls was one of the more intimidating aspect of the work for me… the walls need to be right, true and well built as they will, after all, be charged with holding in a tonne or more of water.

Turkish building block – Tuğla –

The chosen building material for the walls was ‘tuğla’, a special block made out of clay and formed with a hollow, lattice interior structure. These blocks are first sun dried and then baked hard in a special oven. This is the ubiquitous building material in Turkey for walls.

They are also some what brittle. Personally, I am not so keen on them, but, as I said, they are rather ubiquitous in Turkey. They are also comparatively cheap.

Now, our rough builder had been at pains to point out to me that the sides of the pit were not perpendicular. In assessing the problem he had determined that the solution to this problem was to knock off bits of the block, that is to reduce the size of the blocks laid at the bottom of the pit so that when the wall reaches the courtyard floor level we would be able to carry on using full sized blocks.

In other words, he decided to make up for the difference in the size of the hole (smaller bottom, larger top) by reducing the size of the blocks in the bottom of the walls of the hole.

I wrote this twice as it was not what I expected, nor desired.

In this way, at the courtyard level, the blocks will be their full 15 centimetres (full sized), but, as he was aggressively knocking half of the block away (sometimes more than half) at the bottom this meant that the bottom row of blocks were a mere seven centimetres wide.

I didn’t say anything partly because I reasoned that as the soil is the backdrop to the walls, the thinner wall will have nowhere to go, the soil behind it will hold it place… but, I wasn’t happy with his methodology.

Alas, it also transpired that the special hole for the sump pump was poorly located and actually came under the path of the wall – even the curtailed, reduced wall blocks. I feared that if this was not properly addressed at some point, then it would provide a weak point – an easy path for the water to escape from our enclosure.

Now, throughout the two days of rough construction, including the essential building of the block walls, our rough builder had brought along a ‘helper’, someone less skilled than he to do the simple tasks and the basic grunt work.

After the walls were, er, ah… custom trimmed and built up to the level of the courtyard, the rough builder departed as he declared that he had some other business that he had to attend to. He was adamant that he would be gone ‘no more than half an hour.’

Now, culturally, when a Turkish speaker gives a time reference it is not intended to be a precise, digital reference. That is to say, “half an hour” is not intended to mean thirty minutes duration. It is more the emotional intent – what he was saying was he would be gone a relatively short while, do not worry…

He left his semi-skilled ‘helper’ behind to carry on the task of building the walls up to the finished height.

In the event, we didn’t see the rough builder again until the task was completed and he had to return to pick up his helper, his tools, oh, and to be paid…

Now, to be honest, the helper worked to the best of his limited ability. It is true that the size and shape of the finished product will be a lasting monument to his skill set. Suffice it to say, a master block layer he, most definitely, was not.

At this point I also learned that it seems our rough builder has a tendency to over purchase material – to avoid running short when doing a build. The problem for me is that he charges for all the material that he has brought, used or otherwise!

Now, I acknowledge that I should pay for what was used, this is as you would expect. But it was a… er… surprise for me that I was expected to pay for all the extra that he didn’t use. He had no intention of carting the surplus away, and some of it was brought in preparation for the plasterer, nevertheless this was not what we needed, wanted or expected.

Indeed, it was a rather unpleasant turn of events.

However, on the positive side, he did load all the spoil; lugging, dragging, lifting, hefting, hoisting it all on to his lorry and then he deposited it somewhere. As I said, some of the bags were a doddle to lift, and others were beyond what Health and Safety would ever condone being hoisted by anyone.

Removing all the spoil almost made his exorbitant charge worth it – almost, but not quite. I still smart when I think of what he was paid. It was the agreed price… no one to blame but me – I agreed after all…  There are times when I make bad deals… and this was one.

Now with the walls so built, it does not look like anything that could hold the waters of the baptismal pool in place. I was informed and assured, by the rough builder, that the plasterer, would line the inside of the pool with a mesh and use a special plaster that is more or less water proof. He was adamant that this combination would be able to withstand the pressures of the water.

From our projects in renovating our flat, we knew a Master Plasterer. He had been sent out to work as a child and hence, learned his trade the old fashioned way. On the plus side, he really is a master of his art, but, on the other side, he didn’t choose this profession and he doesn’t really enjoy it.

Currently he has found other employment, which still involves his plastering skills, but the work is more varied, and most importantly, the pay is more consistent. We called him to come and examine our project. In his examination, complete with a tape measure and a level he found that there were quite a few challenges before him.

It seems on careful inspection that the new block walls were not straight, were not level, and the structure was not square. It could have been; actually, it should have been, but, alas, it was not. The shape of the pool had its own, unique, kinks and quirks.

The task for the Master Plasterer was to try and straighten out and correct some of the fundamental flaws and make the top of the walls level.

On the day he came, our first task was to go and source the essential mesh which would reinforce the walls… but as we traipsed from shop to shop, he couldn’t get the mesh he wanted. In the end he settled on some plastic coated wire mesh – good stuff, but harder to work with.

Initially he said he would put the mesh on the inside and on the outside of the walls of the pool – he had measured and had me purchase sufficient material for this.

Affixing this metal mesh proved to be an unexpectedly difficult and labour intensive task. At times it seemed as if the wire mesh had a mind of its own. Even once it was fitted and secured in place, it would sometimes find it within itself strength to pop away from the wall, or to refuse to stay in the selected position that had been determined. The plasterer used nails to try and keep it fixed in place until the plaster has been applied… sometimes to no avail.

He had arranged that we would have ‘black sand’ (brought by the rough builder) for this stage of the project. He said it is the best for this task. Also, he sourced a special package of something or other which was to be mixed with the cement and sand and will make the finished plaster, water… er… resistant…

After wrangling the mesh into place and standing in the pool, he expertly applied the ‘mud’ to the walls, embedding the mesh. The notion is, the wall provides form and shape and basic strength, but it is the wall, plus the mesh, plus the plaster in combination that will, ultimately, be sufficient to contain the water. As the water pushes outwards, the mesh, embedded in the plaster, will counter this powerful force. Hence, it is the wall augmented and strengthened by the mesh and plaster which are reinforcing one another, which will resist the outward pressure of the water; kind of like a Chinese finger puzzle – the more pressure, the stronger it seems to be.

As he worked, it became clear that at one place the plaster is just thick enough to bury the mesh, at another it is three or four centimetres thicker to make up for a wobble in the wall. It is a challenge to make right something that is, well, rather wrong.

When the interior was done, he carefully extradited himself and was about to commence the exterior walls. Now, initially, he said he would apply the mesh to the inner and outer sides… now, because of the difficulty in working with this plastic coated metal mesh, he suggested this was not really necessary.

I disagreed.

I could be in error; indeed, the wire mesh may not be required on the outside; truly, at the end of the day, it may offer little structural support. But as we had the mesh, and as our initial plan was to lay it on both sides and as we had the workman to fit it, and as he was being paid for the task, I insisted.

He fitted the mesh.

In this way, all the mesh purchased was used – nothing left over.

He then applied the plaster, smoothing it, levelling it, aiming to make the best base for the finish which will be ceramic tile on the interior and stone cladding on the exterior.

He had to add more plaster to the top of the wall than he desired and felt was acceptable. But, as the walls were not level and they really needed to be.

At the end of the day, he was both done and done in. The pool looked much better – this is just the foundation for the finish, but it looks like something now.

As he was worn out, and as we had the ‘excess building material’ that the rough builder had delivered and I paid for, it was agreed that I would take the Master Plasterer home (he lives in a nearby village) in the church van. We would also take along the building materials that were extraneous to our needs. We know that he could make good use of the building material and we appreciate him and he did put the mesh on the outside as I desired, and he is a jolly nice bloke.

With the pool now prepared, we needed a Master Tiler cum Stone Cladder.

Again, due to the renovations we had been involved in, we just happen to know a Master Tiler.

Before he came, I was sent out to source the tile. In so doing, I found I had the choice of one ‘pool’ tile, and, thankfully, everyone approved of it.

For the exterior, I had in mind a specific type of stone – travertine. I love stone, and travertine is, to my eye, a very pleasant stone. I was able to source and purchase the travertine – it comes from the west of Turkey. It was about the same price as ceramic tile so did not impact the cost of the project, but will look so much better in the courtyard when it is finished.

Now this tiler is a Master – he really knows his trade. He is the one who tiled the upstairs flat, over 90 square metres. He prepped the floor, found the ‘centre line’ and drew out the tiles from there and it took him but one day to do the entire flat.

A wonderful job which was very done as well.

I thought, “For a master tiler, this wee little baptismal pool should be a trifle.”

And I suppose it could have been except everything was off.  Nothing was square and nothing was true. The plasterer had brought it much closer to true… but much closer is not the same as true.

Our Master Tiler set to work and completed the inside walls of the pool in a couple of hours.

Great.

But the exterior stone cladding, well that took a lot of time. And the floor of the pool, that was a real challenge for as as you work, you run out of a place to stand and the high walls prevent you from leaning over to complete the task… and the sump pump hole presented its own, unique challenges partly because two sides were under the edge of the wall… and it was a round hole. He is a Master Tiler, he wants the sump pump to look good as well.

In any event, by the end of the day, the task was not yet completed. He completed a 90 square metres flat in one day, but our wee pool, proved to be such a difficult challenge that one day was insufficient time.

He returned in the morning, to grout the interior and to cut and place the stone cladding for the top of the walls. These walls that are 20 centimetres thick on one side and are 17 centimetres thick on another – even the most basic elements are not true.

Throughout the project, he was cutting the travertine stone using an angle grinder with a large stone cutting wheel fitted. At one point we noted that the cutting wheel was damaged (chunks missing at the cutting edge), nevertheless, with no alternative and no spare cutting wheel, he carried on. This is definitely not what is recommended by those involved in Health and Safety. You could argue, nor is it recommended by simple common sense.

We were near the end of the stone work. In fact, we are at that stage that his helper was cleaning tools – an essential task and one left to the end of the job. The Master tiler was himself cutting one of the last stones with the angle grinder. I’m standing off at the other end of the courtyard trying to stay out of the way of the dust.

Suddenly there was this almighty BANG … I mean it was sudden, it was very loud, and it was absolute… sharp, abrupt and unrestrained. It emphatically declared something had gone very, very wrong.

The Master Tiler’s helper, who had been standing in front of the angle grinder abruptly dropped what he is doing, his hands instinctively flying to his head and he twisted and turned away, walking towards the end of the courtyard. My first thoughts was injury to the face/head.

Thankfully, he was not injured, just shaken up with a serious smack to the face and a few minor cuts. Everything missed his eyes!

It transpired that the cutting wheel, spinning as it does at an extremely high speed had burst apart; all parts of the disintegrated cutting wheel being propelled at that extreme speed away from the angle grinder. The tile master himself, was aware of the danger, and had angled the machine away from himself. He was unscathed.

The bulk of the cutting wheel, with the largest pieces which had been, thankfully, expelled backwards, away from the helper in front of the angle grinder, had flown towards our flat and towards our closed front door.

The largest piece struck the window in the door where it pierced the glass and after creating a massive hole in the window, continued travelling all the way down the corridor to the far side of our flat. The corridor was liberally littered with debris, glass and bits of the cutting disk.

Thankfully, T was not in the corridor at the time but in a side room.

That was… er… exciting.

We were all extremely glad no one was injured.

And, as is in the nature of things, the work continued.

Finally, the master tiler finished his task and now the baptismal pool looks proper. His workmanship was 100% but he was paid less than the rough builder – life is not fair.

I paid him an honest amount – he would not take more. It was the rough builder who had the inordinate recompense. The rough builder, too, has a family to support and being a small builder, work can be inconsistent – paying him more, whilst it irked me, is providing essentials for his family.

This slideshow requires JavaScript.

To finish off, we had a wooden cover made for the baptismal pool. This enables the baptismal pool to function as a table when we prepare the assistance for the Syrian refugee field workers. It also is effective in keeping the children from falling in when it is not in use.

IMG_3034

The pool is complete, and has been commissioned – we recently had our first baptism.

The construction process has been a bit of an adventure.

What really struck me was how the walls alone could not do the task, and how the walls and plaster could not do the task, nor just the walls and the mesh… all three elements are required to make the whole complete and strong and up to the task.

Reminds me that God saves, the Holy Spirit in-dwells and the Church – the Body of Christ – provides the living context for the living out of our Faith. Or to put it another way, we have faith and trust in the finished work of God in Christ, we have the Holy Spirit abiding within us to encourage us to walk in the Way and to give us power to do so, and God has established the Church, our brothers and sisters in Christ – we are not alone, but need one another.

All three elements are necessary.

They are necessary for the baptismal pool to function.

And in the same way, all three elements are necessary for me to grow in Grace and in the Knowledge of God.

Blessing Seller….

Antakya is rather unique among the cities of Turkey. The population that makes up this neglected backwater is strangely cosmopolitan.

The city consists of a mixture of Sunni Turks, Alevi Arabs, Kurds, Greek Orthodox Christians, a minute Jewish population, oh, and now a disproportionate number of Syrian refugee Sunni Arabs. Additionally, the imprint and influence of the time when this area was part of the French Mandate are still discernible.

For a cheap and cheerful explanation of the various religious divisions in Turkey, please refer to this blog: The Religious Make-up of Turkey 

Now in this region there is a preponderance of small – about 36 – 96 square feet – white-washed, often domed, structures. You will see them decorating hill tops, positioned by streams, found in lonely fields, situated by roads, and they are even liberally scattered throughout the old section of Antakya city.

I noted one such white-washed structure that is situated on an isolated patch on the banks of the Asi River – known in ancient times as the Orontes River.

In time, the ‘powers that be’ decided to cast a bridge over the river right at that point.

2010-08-28-Antioch-P1140594-ziyaret-1.jpgHowever, this small structure, white-washed with green highlights, capped with a small dome, was positioned right at the planned bridgehead.

“What was to be done?” I wondered to myself.

“Would they knock the structure down or shift it somewhere else?” I pondered and watched as the project advanced.

In time, the bridge was thrown across the river and the wee structure continued to defiantly stand where it has historically stood. The four lane approach road was built on the opposite shore.

Then, when the time came to build the approach road on the side with the structure, they built one half of the road on the right side of the structure, and the other on the left side – the structure, untouched, unmoved, unfazed and somewhat marooned, now in the middle of the four lane road – remained exactly where it always has been.

2010-08-28 Antioch P1140593 ziyaret

It seems it was too important, or too sacred, to be demolished or even removed to a nearby location. Those who wish to visit this structure will need to negotiate at least two lanes of flowing traffic to gain access.

It was long after this incident that I noticed that this structure has a strange and unique feature. It seems that there was a tree growing in that place and when the structure was constructed the tree, the living tree, was simply incorporated into the building; it continues to this day to grow in, through and out of the building.

These wee white-washed structures, scattered all over this region, are small Alevi shrines.

These buildings have been built over time and have been constructed over the graves of various ‘saints’. These saints can be a ‘holy man’ a ‘sheikh’, ‘a teacher’ or even a ‘Christian saint’ of old.

These structures are almost invariably painted white and most frequently boast a small dome.

Inside the shrines there is a large raised coffin-like structure. This internal feature is plastered over and painted white. It is believed that it has been constructed over the physical grave of the honoured individual. This sarcophagus-like structure is often draped with cloth, green blankets, normal Turkish flags, Green flags or other fabric. The floors are often covered in carpets. The whitewashed walls can be decorated with posters, pictures of Ali, Koranic verses and other writings both in Turkish (Latin) script and Arabic script. These structures are considered ‘holy spaces’. Shoes are strictly left outside.

Within the shrines copies of the Koran and other religious books, teachings, commentaries, and even, occasionally, a New Testament can be found. Local tradition declares that anything left in a Shrine should not be removed.

More often than not, it is the local people who maintain the Shrine – those living nearby or have a special connection with the shrine. Indeed, the structures have initially been built by local people at their own expense – these buildings are outside of the remit of the Religion Department of the government. It is the local people who ensure it is painted, maintained, cleaned and cared for. The door, usually a stout, strong steel door, is closed and locked but opened up on Fridays and other special days and times as according to the Alevi calendar and local tradition. Some can be open on multiple days, but always under the watchful eye of the key holder and self-appointed caretaker of the shrine.

To my limited knowledge no services or other events are planned or executed there – these locales are for individual acts of worship as people reach out to find help in their time of need.

Sometimes you will stumble on a Shrine which is just the grave of the ‘saint’ which has been surrounded by a high wall – but even these, over time, become enclosed and covered.

What do people do at a Shrine?

To the best of my knowledge, you will find no reference whatsoever to shrines within the Koran – these are extra-Koranic structures, functions and activities. They are an expression of Alevi belief and a desire to engage with God.

At these shrines, people will come to pray. Some will come and make a vow to God. Others will make a sacrifice of a chicken, sheep or something else. Others will burn incense. Still others will read the books held within. (For one account of such an individual who read a New Testament in a Shrine – can be read here.)  

IMG_1943

It is a place to try and make a connection with God, to find solace, to lay out your petition, to seek for assistance, to seek redress for a wrong that has been done to you, to pour out your heart, to find help when you need it most.

Interestingly, burning incense plays a prominent part in the lives and devotion of the local Alevi community.

Confession time: I am not aware of the significance that the Alevi community put on the burning of incense, nor which type of incense is burned, nor when it is burned, nor for how long, nor why and with what meaning.

In an evening in the summer, it is not unheard of to have the heady scent of burning incense to be carried on the breeze and onto our terrace.

In the course of my daily constitutional, I have noted a local florist who perpetually burns incense outside his shop whenever he is open. I do not know how much it is costing him, but there is always a censer piled high with burning incense in the front of his shop, pouring forth its pungent scent and wafted along by the breeze.

It is my observation that people in Turkey are very industrious, innovative and hard working. If they can not find a job, they will seek employment wherever and however they can – creating a job where needed, or meeting a need in society. To explore this aspect of Turkish society, you can read this blog here.

For instance, if there is a road where traffic is routinely queued up, during the hot summer months, individuals will walk amongst the waiting traffic selling cold bottled water.

When there is a sudden downpour in the city, catching all unawares, diligent individuals will be out on the streets selling brollies.

Have you ever been caught without a tissue? There will be someone offering small packages of tissues for sale.

As you go about your business, maybe, just maybe, you may wonder how much you weigh… well there is a chap, with his scale on the side of the road ready to answer that question.

If you live in a city and you have a carpet with a frayed edge – never fear, for before long a lorry will slowly come down your street offering to collect your carpet, stich it up with the machine mounted on the back of the lorry and return it to you immediately.

This is the same for the knife sharpener. He has his sharping wheel mounted in a wooden stand which he rolls down the street offering to sharpen all your knives.

Do you need a photocopy? Or do you require some document to be laminated? A man pushing a small cart or converted pram, with a small electricity generator will come by, offering on-the-spot photocopy and lamination services.

Fresh milk and I mean really fresh, unpasteurised milk, plastic kitchenware, fruit and vegetables, these all will make their appearance in your street, as will a man pushing a wheel barrow full of fresh mint and parsley. If you desire to buy bulk onions, the onion seller will sell you a great bag of onions, weighing them with the scales on the back of his vehicle. Clothes, carpets, blankets, shoes, cloth, fruit, vegetables, water melon, well, just about everything will sooner or later go past your door. And for your cast offs, the rag-and-bones man will also pass by your door announcing his services.

And here in Antakya, in this community with a large Alevi population, an enterprising individual takes a hand-held censer with the fragrant, burning incense producing copious amounts of potent smoke flowing along behind him as he walks the street. If you are feeling the need to be blessed, he will stop and wave it before you, the sweet smell flowing over you, and you will give him a wee bit of money for his service. He goes down the street and various business will call him to come and bless their shop, the incense wafting in, and he will also receive a small remuneration for his efforts. You can see him at a distance, the great cloud of incense billowing out behind him declaring his presence as he searches those who desire his services.

It appears that someone will endeavour to try and meet even your spiritual needs on the streets of Antakya.

Nevertheless that void, that longing, that desire to ‘know’ God continues unabated, unrequited and untouched by the fragment smell of incense.

The answer to the longing in the heart of man is not found in shrines, full of dead men’s bones, nor in sacrifice – the blood of chickens or sheep, nor in the making and keeping of vows, nor in tying of votive offerings on special trees or special places, nor in inhaling or bathing in the heady scent of incense. It is not within these activities, as well-meaning as they may be performed, that intimacy with God can be found.

This natural, human, inner longing for intimacy with God is attainable, but like so much in life, it is not on our terms or according to what we desire or what we, in our wisdom, have decided is the Way to attain intimacy with God.

True intimacy is a two way street, it does not occur in a vacuum, nor in a void, nor it is imposed from one side on another. Both parties come together in a mutually acceptable manner.

God, Himself, has intervened in human history; the Almighty has physically entered human history and laid out His Way for mankind to know Him and experience intimacy with the Divine.

This is the Way that He Himself has initiated, and He deals with our weaknesses, our errors and mistakes and, let’s be blunt, our ‘sins’ …and takes care of this otherwise insurmountable impediment to intimacy with Pure, Holy, Righteous God.  It is in walking in His way that we can actually ‘taste and see that God is good’, that we can personally know Him and know His power and experience His Love in our lives. That we can know and receive and revel in the Love of God.

Finding Employment – Turkish Style

It was in the autumn of 2003, the weather was still very pleasantly hot in Istanbul. I needed to go somewhere new in the city and I had never been there before. To complicate matters, I was not really sure of the directions on how to get there. Istanbul is a huge city – it has great communications, bus, mini-bus, underground, ferries – large and small, cable car – it is really well serviced… but, there is always a ‘but’, the population has expanded beyond the capacity of even this broad, rich and varied public transportation system.

On this day I headed out to the banks of the Bosphorus Straight – that international water-way that divides the European side and the Asian side of the city of Istanbul, that salt-water passage that connects the Black Sea and the Marmara sea – near the harbour in Kadıköy (formerly known in ancient times as Chalcedon).  I entered the man-made maze created by the multifarious lanes and a myriad of bus stands, all filled with a teeming swarm of buses that make up this, one of the multitude of city bus stations in this mega-city.

This open air station is a continuously surging shoal of city and private buses, disgorging their human cargo and reloading for the next foray as they power forth into the maelstrom of Istanbul traffic. Each bus, council or private, is prominently proclaiming the name of their destination and their route designation on the front, sides and rear of the bus.

The problem for me is I did not know nor recognise any of these destinations nor did I have any idea of where they are located in the city nor what the numbers of the routes mean. All this very valuable information, which is full of meaning for the many and yet, sadly, devoid of any practical meaning to the uninitiated such as I.

I had been instructed and was diligently searching for the ‘14Y’ designation. My problem was, I was finding a significant number of buses with destinations beginning with 14 – but, alas, none ending in all-important ‘Y’.

Finally, I caught sight of ‘my’ bus, standing at its appointed spot, across the many lanes from where I was. On seeing it, I carefully, and yet as quickly as I could, made my way, doing my best to avoid the buses powering away from their stands and heading out into traffic and other buses prowling through the narrow lanes to arrive at their appointed resting places.

On attaining the correct stand, I entered ‘my bus’ and pressed my ‘Akbil’ (a Turkish name representing ‘White Ticket’) to be rewarded with the satisfying ‘bee-boop ’ which indicated that my ticket had been accepted. This ‘Akbil’ is kind of like a key fob, but the electronic head had been charged with some money and on every use the cost of the ticket is deducted from the total. Every time you press the key fob, you hear the comforting ‘Bee-boop’ and you know you have paid the cost of the ticket – no hassling with correct change and such, it has simply been deducted from my device – what a wonderful system!

As I sit waiting for the bus to depart, I ponder the fact that I had been rushing to find the bus as I absolutely abhor being in the position where I would arrive at the appointed spot in time to forlornly watch the tail-lights of the bus powering out of the station – I dread missing my bus by a minute. My motto – ‘better a half hour early than a half minute late’.

This day I was happily early. However, in my haste not to miss my bus, I had successfully missed my lunch. In fact, I hadn’t even brought a bottle of water to quench my thirst and there was no way that I was about to leave the bus to find water.

Then I observed man boarding the bus – he didn’t purchase a ticket – in his hand he was carrying a blue pail and in the pail, proper, sealed, bottled water which he was offering for sale. Once he has visited our bus, looking for custom, he would exit and board the next bus. This water seller isn’t sitting somewhere waiting for custom to seek him out or to go to him, he is proactively out, he is diligently searching for buyers, wherever they may be hiding. He is bringing his service to wherever custom may be found.

Now, on another day, at our flat in Idealtepe in Istanbul, I heard a strange noise emanating from the street outside our home – some kind of power machine making an unfamiliar and rather unusual sound. I looked out my window and there was a flat-bed lorry standing in the street. On the back was a large table and on one side was a machine. A man and a boy were manhandling a large runner type carpet onto the back of the lorry. They twisted and turned their awkward burden, to line it up and put it into the machine and then carefully they guided the edge through the machine. Two balls of cotton or twine or some other material magically spun and twirled as the thread was pulled off and into the machine. Powering all this was a small petrol powered electrical generator. The machine itself was stitching a proper, finely finished edge to the carpet.

Not leaving any opportunity ignored, this industrious individual has taken his lorry and offers not only repair work, but people can purchase a hall runner from him and get it cut to their own, unique specifications, and then have it machine finished, right there on the lorry, outside their home.

The carpet finisher isn’t in a shop, somewhere, waiting for you to come to him, rather, he has chosen to go out onto the streets and is actively seeking for custom.

Have you ever found yourself out and about when you remember that you need something photocopied?

That is not a problem here in Turkey. Of course you could go to a copy-shop and have it done there, or you could simply pause on the street corner where a man has a photocopier and a small electrical generator, both mounted on a small cart – he stands ever ready to do your photocopying right there on the street while you wait.

And if, by chance, you want it laminated, well, there is another chap standing nearby with a cart, generator and laminator – waiting to serve you.

They are out, pro-actively seeking custom.

Sitting in your home you become accustomed to various calls resonating through the streets. The dulcet tones of a lady singing “SeeepPPPpet VaaaarrrRRRR” and you know the lady peddling plastic kitchenware is making her way down your street.

Once or twice a day you will hear the sing-song call “EeeSSssskkkiiiiJJJJJiiiiiIII—ahhhHHHhh” – the rag and bones man is making his presence known.

Sometimes the caller has a distinctive call which I have been unable to distil down into recognisable words – but everyone recognises his call and everyone knows what he sells.

The call rings forth, sounding like “SoooOOOOOooootTttt” – ah, you say to yourself, the melon seller is going by.

In fact, the sound distils down to resemble the Turkish word for milk and bears no likeness that I can discern with the Turkish word for melon, but everyone understands his unique call and instinctively knows what he is peddling.

Another variant is to change the word order. For example normally you declare the equivalent of ‘Fresh Bread Rolls’ but what a local seller declares as he walks the streets is ‘Bread Rolls Fresh’. He has made it different to catch your attention and becomes his own unique, differentiating catch phrase.

This is true for virtually everything you will need. Everything may be a bit more expensive, or there may be less selection or it may not be as fresh as you would like, but, you could practically source everything you need from your own door step.

Bottled water, plastics, cleaning supplies, clothes, cloth, blankets, shoes, sheets, vegetables, cleaning supplies – and more than I can currently recall.

All brought to your door. Full service, and with a smile.

The Turkish attitude to employment is very pro-active. If someone hasn’t or cannot find a ‘normal’ job, they may be able to create a job, to meet a need, to fill a gap; to earn a crust. As it says in Proverbs: “The appetite of labourers works for them; their hunger drives them on.” Proverbs 16:26 NIVUK

For the rest of the population, yes, they can go to shops, malls, markets and other places to buy various things – but at the same time, there is a whole army of people bringing their goods and services to whomsoever, wherever they may be.

 

Watch Your Step…

Our home is not old in comparison with the abundance of truly, really old buildings that you will find throughout Turkey and that is without considering the few ancient buildings that are still standing. Our home is probably just under a hundred years in existence.

We believe it was constructed during the French Mandate (1923 – 1946). That was the time after the suzerainty of the Ottoman Empire and before this area was joined to the Turkish Republic.

The administration by the French was a mixed bag as most colonial powers are inclined to be.

French rule was oppressive and they tended to accentuate the natural racial and religious divisions within their mandated territory – they adhered to the British maxim of ‘divide and rule’. They imposed the French Franc as the currency of the territory, but the Franc was administered according to the needs of France and without regard to the needs of the Mandate Territories.

On the positive side, the French championed modern town planning, civil engineering projects, schools, hospitals and so on.

But overall, the French were more interested in administering their Mandated territories, today what is the Lebanon, Syria and the Turkish province of Hatay, according to their own socio-economic priorities and, as always, with a view to their rivalry with the British.

Within society there was a lot of unrest and discontent with the dominating control exercised by the foreign power.

But, it was also in this time that the much appreciated, large, green, treed, central park was constructed in Antakya. The French also constructed some fine, stone buildings including a small parliament building for the newly minted Republic of Hatay (established on 7 September 1938 and dissolved when merged with to Turkey in 23 July 1939). The independent Republic of Hatay had existed for about ten months.

It was in this time that we believe that our house was constructed.

It was built with a mixture of old and new building methodologies and materials. The outer walls, are old school, built of rough, field stone with mortared outer faces with rock-rubble in-fill and built to 60 to 70 centimetres thick. For the roof, they used heavy steel ‘I’ beams to support a reinforced flat concrete roof.

The homes built at this time were built in the traditional configuration with high ceilings and laid out around a central courtyard with all the rooms opening into the courtyard. If you desired to go from one room to another, this would entail a trip to the courtyard to make the connection.

In summer time that would be no problem – but in winter, in the drizzling rain, it was less than desirable to have to go outside to go to the kitchen, or toilet or bedroom via the dark, damp, cold, breezy courtyard.

It appears that our large house was built in conjunction with the neighbouring house, and together it was a corporate home to a large, extended family.

At some time in the life of the building, it seems that family relationships hit the buffers, which resulted in a wall being erected between the houses. It was not a planned wall nor a bearing wall.

When we first moved in we were doing some renovations in the kitchen and discovered that the dividing wall was no more than a single brick wide. When we vigorously attacked the wall to remove the plaster on our side… we also unknowingly and unintentionally, knocked the plaster off the opposite side of the wall.

The neighbour complained – wouldn’t you?

In the end we accidentally poked a hole in the wall and then discovered its depths – or lack thereof. We replastered their side as well as our own.

Anyway, back to the history and development of the building. After the construction of this rather flimsy dividing wall, and at a later date, someone decided to extend the back wing of the building by utilising and extending the building out and into the courtyard. Doing this consumed approximately one third of the courtyard. When we compare our courtyard with our neighbours, it is clear that when our home was initially constructed, the courtyard was of rather generous proportions. As a result, there was sufficient space to give some area to a room and still leave a reasonably sized courtyard.

The extension was constructed with more modern columns and beams and they poured a concrete extension to the flat roof. In this manner they joined all the rooms on the wing on the back side of the courtyard under one roof.

Thus this newly created single, long, rectangular room, running the length of the old wing, meant that no longer were people required to go into the courtyard to communicate from room to room. No more traipsing through the rain carrying the evening meal to the dining room, no more dreading the midnight stroll, no more cooling the house in winter as someone must exit to go to another room.

Of course, the two rooms on the opposite side of the courtyard still required a courtyard stroll to access. The main access to the property is via the front street and by means of a corridor which bisected the two rooms. So one would enter the property and then cross the courtyard to enter the extended wing at the back of the courtyard.

Interestingly, this meant that the newly created room had both doors to the pre-existing rooms, but also windows, for formerly they looked into the courtyard; now they looked either into the new room, or from opposite perspective, into the former rooms.

It was rather strange.

Hence, it was in this unplanned manner, that our home has historically grown and been extended. These changes occurred organically, without planning – simply answering the needs of the occupants at that time.

Which brings me to our corridor. Our corridor is a johnny-come-lately, joining the oldest part of the house with the first addition which consisted of the kitchen, bathroom, toilet and finally with the last addition, the added-on extension that consumed part of the courtyard.

As is in keeping with its origins, it is a bit odd.

Firstly, it isn’t straight. Well, full disclosure, the whole house is a collection of odd angles – nothing, anywhere, is straight: the plot that the property is built on may, possibly, have a 90º angle – somewhere, but truly, everything is skew-whiff. The corridor is just one more example of this household trait.

Secondly, the corridor is of different levels: the lowest level is at the door to/from the courtyard – this was the level of the added-on room. The higher level, a mini-step of about two centimetres, goes from where the former courtyard door was but is now situated one third the way down the corridor. This early section of the corridor goes towards the back of the house and joined the old, original wing with the later addition of the kitchen, bathroom and toilet.

The multi-level dimension does not end there.

The kitchen, bathroom and side room are all higher than the corridor.

So, someone coming into our home, would begin at one level, and then, one third the way down the corridor would have to negotiate the mid-corridor lift of about two centimetres. Proceeding down the corridor, wherever they would desire to go, it would involve another mini-step of something like three centimetres to gain entry to one of those rooms.

We have noticed that many of our visitors have been stumbled, literally, by the mid-corridor change in height.

For us, it became so much a part of our life, that we negotiated it, often without even being cognisant of it. As we ceased being aware of it, it quietly morphed into becoming part of the wallpaper, so to speak.

However, when the workmen put in the pipes for the central heating system, they had to trench across the floor at the lowest level of the corridor.

Thus, right at the entrance from the courtyard into the house, the tiles were broken up to enable the placement of the central heating piping, this provided an opportunity to retile that first third of the corridor, from the door to the mini-step. We could correct the stumbling block, we could remove the needless and unhelpful little step.

Because there was no way we could get the same style of floor tiles, this meant that we would be utilising a different floor tile pattern. Therefore, we needed a logical point to change from the newer tiles to the former – we did not want to retile the whole corridor. Logically, breaking where the corridor already changes direction and width and height would also provide a reasonable visual break for the tile work.

So, this we arranged to have this done.

The tiler came late in the day, after completing a full days work in a town some 40 odd kilometres out of Antakya. He arrived and immediately flew at the task. He put extra gunk at the end where the mini-step was and then gradually brought the tiles down to the old level by the front door. I had failed to purchase the required ‘extra’ gunk, and so he had to be creative with what building materials we had lying about to beef up the amount of gunk to be able to complete the job.

The finished product looks good. The tile are a wood-effect design that actually doesn’t look bad. The tiles are also non-slip; and they really, honestly do deliver on being non-slip. That is an added, unplanned bonus.

The new tile work looks good.

Well, of course, if the grout lines had been lined up it would have looked a lot better. But, at the end of the day, it was short notice, he was already committed to other work and, hence, it was done quickly. Understandably the chap was tired. The tile work covers the offending scar where the central heating pipes entered the floor, and is well laid, there is no discord between the tiles creating mini-stumbling points.

And most importantly, there is no mini-step now.

That is great!

But, as I walk the corridor two things strike me.

First off, I am consciously aware that I am ‘going up’ when I walk from the front of the house towards the back, and when I return towards the front of the house, I am ever cognisant that I am walking ‘down’ the corridor. It is very slight, maybe two centimetres difference over the course of a metre, but my legs or feet or whatever, faithfully report the change to me.

The other thing I notice is it seems the step had been programmed into my walking. I sub-consciously anticipate the step, ready to automatically make adjustments for it – now I am aware of the absence of the mini-step. On coming to the former height change, I hesitate, not stumble, but my attention is drawn to the ‘missing’ mini-step.

I am sure any visitors we have will not miss it. Hopefully they will not even be aware that there was a mini tripping-step there.

But for a week, coming and going, I was aware of the missing step. My mind could be elsewhere, but when coming to the location of the former tripping-step, I was suddenly aware of that it wasn’t there. Over a week later, I’m still cognisant of its absence.

Oh, one other thing I noticed: on walking the transition from the mini-ramp to the rest of the corridor, I feel the change from ramp to flat. No, I do not think that will be a tripping hazard… at least I hope not.

This is an example of muscle memory, a ‘learned’ and then ingrained pattern of walking the corridor. This enabled me to negotiate the mini-step day or night or on a midnight stroll – in pitch darkness – and all subconsciously, flawlessly and effortlessly.

I had become both unaware of the step and unaware of my body coping, silently, with it.

It causes me to wonder, “What else in my life have I made accommodations for, and silently deal with subconsciously?”

There may be areas of compromise, of, er, ‘adjustment’ that maybe should not be. Yes, it may make life easier, but I’m called to doing that which is ‘right’ and not that which is ‘easiest’.

I think I will have to ponder this …

Do You Like Fish…

Equi's Fish & ChipsTo be honest, I do not enjoy eating fish. Well, the notable exception is the excellent Fish& Chips from Equi’s in Hamilton, Scotland. Their Fish & Chips are light, fluffy, not oily, no bones – absolutely wonderful.

But in all other cases, is it the taste, or the bones, or the smell or the skin that I find offensive?

Probably “Yes” to all the above.

However, my better half has a deep felt appreciation of a good fish meal. I encourage her to indulge and have fish whenever she so desires; as long as I do not have to join with her, I am happy. But she is not keen on preparing two different meals – the old cost – benefit calculation: the cost (preparing two different meals) against the benefit (having a fish feast) generally results in her not having fish as often as she may like.

Maybe, just maybe, having fish less frequently enhances the pleasure when she is able to partake of it.

However, if we ever go out for a meal, it is a prime opportunity for us to have something different, without the hassle. Well, there is always the hassle of the bill, but that is a different story.

Recently we were blessed by two young people who came down from the UK to help with the refugee ministry. They may not appreciate being referred to as ‘young people’ but at less than ⅓ of my age, to me they are young people – full of vim and vigour. Therefore, although they are older than I was when I married my wife, and they are in full time education in University, for the duration of this blog, they will be referred to as ‘young people’.

They helped in preparing the bags of food stuffs, in loading the lorry and in the distribution of the food to the Syrian refugee field workers living in the fields northeast of town.

They also helped with the children’s work, both in the city and out with the refugee children. They do not speak either Turkish or Arabic, but the children responded to the attention, playing games and interacting with adults who have time for them.

They also dug a pit in the middle of our courtyard, ½ metre deep and roughly 1½ metre by 1¾ in size.

the holeYes, we wanted the hole dug.

So it seemed only right that on the day before their departure, after all their diligent labours and as a small way to say ‘thank you’, my wife and I took them to see a few of the local sights.

We had suggested a walking tour of the so-called Titus Tunnel – this amazing civil engineering feat; a tunnel dug, with hand tools, through solid rock, roughly 2,000 years ago, in the time of the Roman Empire.

Seleucia & AntiochThe tunnel was initially commissioned by Titus’s father Vespasian as a water diversion project to protect the harbour of Seleucia – the harbour of Antioch. Antioch is twenty odd kilometres inland, and Seleucia acted as the harbour of Antioch and from time to time hosted elements of the Roman navy.

The project consisted of a dam, upper approach channel, the first tunnel, a short intermediary channel, the second tunnel and a very long discharge channel to take the waters to the sea – all to by-pass the harbour and the inevitable slitting that resulted. The whole series runs roughly 1.4 kilometres in length.

The work was begun by Vespasian, carried on by his son Titus and, finally, it was fully finished some thirty years after it was begun by Antoninius Pius.

This amazing undertaking was designed by engineers of the Tenth legion Fratensis, and built by Roman legionaries, sailors, and, unavoidably, prisoners. Some scholars believe that Jewish slaves, who were taken by Titus in the siege and destruction of the city of Jerusalem in AD 70 – as recorded by Flavius Josephus, a Roman-Jewish historian – were employed in the construction of this channel.

The works began with a dam to divert the waters of the gorge to the tunnel. The dam was constructed of a masonry structure 16 metres high and was 5 metres wide at the crest. From the dam to the tunnel there was a 55 metre long approach channel.

Upper Entrance - 06-09-08 Titus Tunel Samandag DSCF2769The tunnel itself was to be forced through the base of the intervening hill – a rocky spur of the mountains from which the flash floods would torrent down the narrow ravine and, before this civil engineering marvel, deposit their debris into and silting up the harbour.

Here is where it becomes truly amazing. Using just hand tools, the living rock of the mountain was excavated, creating a channel 6.3 metres wide, 5.8 metres high and for a length of 90 metres and that is just the first tunnel.

This tunnel is high and wide enough for two articulated lorries to pass side by side!

After the first tunnel, there is an intermediate channel which connects the two tunnel sections. This channel is still deep under the hill, being 5.5 metres wide, 64 metres long, but, significantly, 25-30 metres high and with just a narrow slit, 2 metres or so wide, open to the sky.

Following this is the second, shorter tunnel which is 31 metres in length, 7.3 metres wide and 7.2 metres in height.

Thus, to traverse under the mountain spur required tunnelling for a distance of 185 metres through solid, rock-hard rock. But this, in and of itself, was not the solution to the problem.

Once on the opposite side of the hill the flood waters still had to be safely directed away from the harbour. Hence, a discharge channel to the sea was constructed. This was 635 metres long, with varying widths ranging from 3.8 to 7.2 metres and the height of the walls of this channel vary from 3.7 to 15 metres. This, once again, was hand chiselled out of the unbroken bedrock. The course of the discharge channel travelled towards the Mediterranean Sea, following the hillside and bending to the right to carry the waters well away from the harbour mouth.

This slideshow requires JavaScript.

It really is an awe-inspiring structure and I felt, well worth sharing with our visiting young people. One of the young people is reading engineering and this is a good example of Roman engineering, and the other is reading architecture and funnily enough, this is a good example of Roman design.

They seemed to appreciate it. Mind you, I did get a bit lost – how do you get ‘a bit lost’?

This is how: after we exited the tunnel on the topside, I struck out to find the overland trail that takes you back over the top of the hill – something I’ve done numerous times in the past. Initially things went well, but after a while, it became clear to me that we had passed the point where the stream bed, where we were walking, and the trail intersected. This would be the ‘little bit lost’ bit, as I did not know where we were, where the path was, but I did know how to go back if it came to that…

Over Top Trail - 06-09-08 Titus Tunel Samandag DSCF2790In the end I did find the trail head! We returned via the overland route, standing above the entrance to the tunnel which was at the bottom of a vertical drop from the trail side and cresting the hill, seeing the expansive view of the Mediterranean Sea with an incredibly long, straight stretch of sandy beach for kilometres going south ending in the spectacular, in Turkish `Kel Dağı’ being translated as ‘Bald Mountain’ – in ancient times it was known as Mt. Casius now is also known as Jebel Aqra – rising out of the sea and the far slopes of the mountain demarcating the border of Turkey and Syria. It was a bit a palaver finding the start of the trail, but I think well worth the effort. Not sure what the young people thought….

After our walking tour through the tunnel and back over the hill – and after looking down through the 1½ – 2 metre wide slit at the top of the 64 metre interconnecting channel of the two tunnels – we took a short excursion to the local necropolis Beşik Mağara – The King’s Grave, an ancient graveyard carved, once again into the solid rock, with rooms, and rooms off rooms, and chambers and graves filling all the spaces.

When all was said and done, we returned to the ticket booth at the entrance to the combined site. It was time for lunch.

As we were by the sea shore and in the small village of Çevlik, I asked what the young people would like to eat for lunch.

Actually, what I asked was if they enjoyed ‘fish’ – I already know my wife does and this seemed like a natural opportunity.

Our young people enthusiastically said they very much enjoy fish.

So I asked the man in the ticket booth if there was a ‘good’ fish restaurant nearby. He had a recommendation. He also left nothing to chance, he made a call and the owner of the restaurant hopped on his motorcycle and sped up to the entrance of the Tunnel to guide us back to his restaurant.

Good thing, too, as I would never, ever have found it otherwise – it was past all the restaurants in the village proper, and a good ways down a road that led to the harbour side.

The restaurant was right on the harbour front, one side facing the road, the opposite side was the concrete apron of the harbour.

The building consisted of a large, high roof with open sides, gravel floor, simple tables and the ubiquitous plastic chairs which are normally white, but in this instance they were brown – on the left, under the large roof a small kitchen area had been created and with a cement floor.

To be honest, it wasn’t the most attractive of places and if it hadn’t been heartily recommended and if the owner himself had not collected us and brought us here, I would never have darkened the doorway.

My first question was if they had any alternatives to fish.

I’m a diabetic, the others were understandably hungry and they wanted to eat, however, I needed to eat. Happily they cater for the odd non-fish eater.

We sat down a bit away from a party of what looked like dock and boat yard labourers. There was no one else in the, er, restaurant.

Also, there was no menu.

When asked what they had, he said he had two kinds of fish and he rattled off their names – in Turkish. Now, not being a regular fish buyer, I knew the words to be some kind of seafood, but what kind, I hadn’t the foggiest notion.

A quick recourse to my ever present dictionary (smartphones can be very helpful), I presented the two offerings to the fish-eaters; bass or sea bream. Not being a fish-eater, knowing the English names didn’t mean any more to me than the Turkish names.

They opted for bass, and for me, I took the chap’s recommendation for the non-fish alternative – never get clever and make suggestions in a restaurant like that.  Let them make what they know, are comfortable with and have the ingredients for.

My kebab came and it was fine. They will receive no prize for portion size , presentation nor flavour, but it did the job, seemed to be well cooked and safe meat – what more could I want?

IMG_2110The bass platters came and I was assured by those who heartily partook that it was not just good, but very good. The owner assured me the fish was not 24 hours out of the water caught in that general vicinity and landed in this harbour the previous night.

As we were sitting there, letting our meals settle, there was progressively intruding loud and distinctive noise coming from our left as we were looking at the harbour. Slowly, a massive and I mean a really, really, really big crane came crawling into sight.

No doubt there are larger such monstrosities in the world, but this was happening before our eyes and it was, for us, a very, very large crane.

IMG_2116It was moving along the harbour front; well, by ‘moving’ I mean it was slowly creeping along.

Nevertheless, because of it’s size it was mesmerising. As our guests seemed to be interested in the slowing passing sight, we remained at our table – I suppose it was our after dinner entertainment.

I counted the counter-weights on the back of the crane, it was carrying 100 tonnes of counter-weights in addition to its already impressive bulk.

One of our young people was now standing, staring, fascinated by the sight before him when the man guiding the machine forward saw him and called him over. He immediately ran over in front of the trudging mega-crane.

The modern, it looks brand new, machine shuddered to a halt and he scrambled up the broad, one metre wide steel tracks, then he moved along the top of the track and finally up to the control cab mounted on the front of the machine.

Not long after, our remaining young person, was encouraged to join him on the massive machine. She, too, scrambled up the steel track and was encouraged to sit inside the control pod – an operators view of the proceedings.

Whilst they were there, looking at all the controls they saw a multitude of monitors which showed various aspects of the machine and it was clear from what they saw and what the operator was able to communicate that these various monitors would show the angle, tilt, lifting, weight and a myriad of other technical and essential data that would be indispensable for a safe lift… maybe you noted that I said ‘would show’, this is because the operator indicated that these various monitors and sensors had not been ‘calibrated’ and hence they all were “kaput” (his word). He was operating this ginormous machine by his innate skill, his experience and fundamentally, by the seat of his trousers…

Nice to know.

Once again the machine was set into motion, slowly crawling towards some fishing trawlers which previously had been hoisted out of the water and were now sitting dock side for maintenance and repairs.

IMG_2330The operator indicated he was going to pick up and move the fishing trawler on his right and move it into the harbour.

To turn this massive creation, it uses the standard track vehicle technique, either stopping one track and the other continues to move causing the machine to pivot around the stationary track, or, when necessary, one track reverses as the other drives proceeds forward for a faster pivot. At diverse times, he used both methods to reorientate the machine.

There was a small fishing boat on the quayside, and this goliath had to be pivoted to its right to avoid it. Mind you, he could not go too far right as there was a line of parked vehicles there.

He pivoted and continued his trudge down the quayside. Finally around the boat, he pivoted back and straightened his path towards his destination – leaving massive white friction dust from pivoting such a mammoth machine on the concrete.

He came once again to a grinding halt to enable our young people to abandon the cab and they scrambled down the stationary track. They then came over and joined us on the water’s edge to watch the proceedings.

For our young people, the machine was stopped to enable them to climb on and off, but in the course of its travels we witnessed a couple of times young men clamouring on the moving track to chat with or get cigarettes from the operator before disembarking via the still moving tracks.

The operator then began moving forward once again but this time he opened it right up and it was moving along at twice, even thrice it’s initial speed. It was veritably sprinting down the quayside.

Truly, however, it was still slow moving – but such a beast at any speed is a marvel to behold.

He arrived and his prey, the fishing trawler was on his right hand side, the harbour – the watery destination – on his left.

The crane swung over to the right, massive cables were hanging from a rig suspended from the crane. These cables were unlinked and two cables were passed behind the trawler and their matching cables in front. There were people onboard the trawler helping to move the cables to their appropriate positions. The positioning of the cables seem to be selected by the ‘eye-guess’ methodology.

Once the cables were on either side of the fishing trawler, men clamoured underneath the ship to link the cables together, ensuring the linking point was exactly under the keel. The linking device was a massive ‘u’ shaped steel fitting with the open end being closed by fitting a huge pin. This device was to rest directly under the keel and hence they planned to lift the ship, basically from two points under the keel.

It was not easy to wrangle the unwieldily cables into the fittings, and then to manoeuvre the heavy, large pins to close the open ends. There was a considerable amount of time that the men struggled and laboured underneath the trawler and underneath the keel.

All the while this 75 tonne fishing trawler was being supported on some wooden beams beneath the keel and the sides of the ship held in place by eight or ten (per side) round wooden props, leaning against the side of the ship to hold it upright. Friction, it seems, is a powerful force.

In the fullness of time the men succeeded in getting the fittings fitted. The men onboard used ropes to secure the cables in the right place along the ship – then they disembarked.

The crane operator began the lift, monitors of no value, he trusted what he was seeing and his experience.

Tension was applied.

The precise lifting points under the keel had been selected by the ‘eye-guess’ method as well – so as the tension increased it was becoming evident if the correct locations had been used. The trawler lifted a bit, moving slightly forward and back, but, basically remained level.

A bit more lift, and all the supporting props on either side fell away – the massive trawler was now fully airborne. Once free of the supports, it immediately swung backwards towards another trawler on the dockside.

IMG_2337

This trawler too was ashore for maintenance and repairs and was supported in the same manner by resting on beams under its keel and with supports propped up on either side. It was at 90º to the first trawler, and so the back of the airborne trawler was swinging backwards and towards the broadside of the other trawler.

One touch and it was my fear that the trawler would toppled over, and then to probably collide with the trawler parallel to it, which would have toppled and onwards…. There were about five or six trawlers side by side on the quayside…. trawler dominos…

It was close. Well, it looked very close to me. It was a 75 tonne dead weight swinging on the cables – but by talent, efforts, planning or just dumb luck, it refrained from nudging the other trawler.

Whilst it was hanging there I noticed a number of workmen scampering around with paint rollers in their hands. Wherever the ship had been supported by various props for the repairs and maintenance, it could not have been painted. Now the supports had all literally fallen away and here was the only opportunity to paint where the supporting posts had once been – and oh, also painting where the keel had rested on massive wooden beams.

So these men, in their construction ‘flip-flops’, safety ‘hair gel’, busied themselves, scuttling around and under this massive, moving target to complete the paint job. Health and Safety must have been busy elsewhere on this day… for what could possibly go wrong…

Now the ship is lightly swinging in the air and they are getting ready to change its orientation; it is sitting parallel to the water and in order to move it across the quay to harbour waters it must be swung 90º. Meanwhile, the workmen continue to scurry around the underside of the trawler, feverishly painting any unpainted bit, or the bits that were scraped by the cables during the initial lift. They must get right underneath the vessel in order to paint under the keel.

Additionally, there are men, hanging on to ropes fore and aft of the trawler, who, through brunt man-force swung it 90º so now the trawler is parallel to the other trawlers on the dockside.

Slowly, this massive ship is moved across the dock, and to make matters a bit more challenging, it must pass through a narrow opening between the propped up trawlers and a smaller fishing boat resting on the dockside near the water.

To achieve this the crane is swinging as these machines do, on its central ring, but the machine must also be moved, forward and the machine itself must be turned towards the harbour – all while holding the trawler in the air, with men fussing around underneath and others hanging onto ropes to control the orientation of the vessel.

The men holding the rope off the aft of the trawler – the ship is moving aft first towards the water – are running out of quay to stand on and are on the far side, between the moving trawler and the propped up trawlers.

I am wonder what happens next, when they scramble underneath the still moving, swaying trawler, to our side, bringing their rope attached to the aft of the ship with them.

IMG_2355Also at this point I was puzzled as to how they were going to put the trawler into the water – it kind of looked like it was going to go aft in.

I was moreover, curious as to how they would get the cables out from underneath the ship – it was clear, once in the water, no one would go down to release the massive pins.

Then the men holding the aft rope, there were just two men, on the quayside, with the rope to the aft, were straining with all their might, pulling for all they were worth and relentlessly being slowly drawn towards the waters edge.

This slideshow requires JavaScript.

They resolutely held on, in this tug of war; man versus 75 tonne fishing trawler.

Slowly, the back of the trawler began to pivot towards the harbour side, slowly moving to become parallel to the quayside – ultimately the men were victorious.

At the start, the trawler had begun parallel to the harbour but on the far side of the dockside. It had been brought 90º to move across the quayside, and now another 90º to realign it once again, parallel to the harbour side and ready to be deposited in the water.

A space, large enough, well, just large enough, had been cleared of the little fishing boats moored to the harbour wall to receive the trawler. Mind you, the space so created was just able to accommodate the trawler. Indeed, whilst the lowering the trawler was happening, a workman was diligently holding the nearest small fishing boat out of the gap. Slowly the trawler was lowered into the water.

Once in the water, the cables were relaxed and as the tension was removed, people quickly boarded the trawler and began moving the still connected cables along the side of the ship to pass underneath and come out on the aft end. The pins joining the cables would be undone, later, on land, where it would be eminently more feasible.

The trawler was free.

75 tonnes of ship lifted up, painting topped up and swung into the harbour, now back in its proper environment, fully supported by the water and ready to be about it business on the open sea.

For us, the show was over – and what a show it was; talk about dinner time entertainment. Evidently the other trawlers are to be lifted and deposited in the harbour waters – whether on the same day, or later, we didn’t know. For us, what we had seen was sufficient.

This was one ‘fish meal’ that I was more than happy to be part of! Sometimes, it is in the things that we would not normally choose to do that surprise blessings and intriguing situations develop – need to be ready to move our of my comfortable routine from time to time.

As we departed, leaving behind this most powerful and modern of machines we made our way to visit, among other sites, the Monastary of St Simon the Stylite, a ‘saint’ who lived 68 years on top of a pillar in a quest to know God – what a dramatic contrast.

A Day in the Life…

Well, today has been a day.

I know we do not ‘control’ any of our days – we are dependant on so many varied variables, but today has been distinctly different.

My normal routine had already been knocked for six because a man was coming to fit a sump pump in the house (another story why we need this), and I needed to be in attendance and consequently, as my normal morning routine was superseded. This being the case, we arranged for a man who can install central heating systems to come and appraise our flats and produce a quote.

Consequently, I went for my morning constitutional at 08:00 – the time I normally give to practicing the guitar.

Just to complicate things, we had anticipated some visitors arriving on the previous day in the afternoon – but in the event, they actually arrived at 11:30 – er that is 23:30… a time that I call night.

A brother from Diyarbakir, in the east of the country, was shepherding them on their desired tour – they themselves visiting from South Africa.

In spite of arriving late the night before, they were leaving by late morning today – an exceptionally brief visit.

Over breakfast there had been a discussion of the work that the small Christian Fellowship here is involved in with the Syrian refugee field workers. They were interested to learn more, and see a bit of the work. Hence, in my absence, it was decided that I was drive the church vehicle and lead them up the valley to some of the Syrian refugee encampments that we labour amongst.
As I was scheduled to be at the house to ‘attend’ as the man was to fit the sump pump, he was rung and we cancelled the appointment – to be rescheduled for another day.

It was also suggested that rather than having the ‘man’ dig the pit for the sump pump, that I dig a hole 1 meter deep by about 80 cm square before we call the man to come back… Okay…

With these changes in play, we also rang the central heating man and arranged for him to come in the afternoon…

My plans for the afternoon have now been dealt a blow as well; my normal routine had been suspended and now the alternative plan (attending the sump pump man) was superseded.

I climbed into the church’s ten passenger Volkswagen Transporter and began my hour long drive up the valley to where we do our aid distribution…

There were about ten or twelve people in the other van.

On the way up the valley, I was leading, when, unexpectedly the following van overtook me. Now in front, he promptly pulled over to the side of the dual carriageway, stopping in front of a small shop. It seems they wanted to get some refreshments of some sort.

When they were ready, I headed out again – faithfully holding to the 80 kph speed limit. I utterly detest speeding tickets and paying money for, well, nothing really, just a certificate of speed attained.

We passed through the first police check point with no problem. But, further up the road, I was selected to be checked by the Gendarme at their security checkpoint.

I dutifully pulled in and stopped – the other van, not being so selected, carried on. I rolled down my window, greeting the soldier and then turned away to turn off my phone which was playing music to accompany me whilst I drove. The soldier looked in the empty van, looked at this late middle aged, white-bearded foreigner and when I finally turned from my phone, he told me to carry on.

Off I went, rejoining the traffic on the dual carriageway and powered up the valley – holding to the 80 kph speed limit.

Then ahead I spied the other van, moving slowly along on the side of the carriageway. Now the vehicle I’m driving is a rather distinctive black Volkswagen Transporter, so when I over-took them, I ‘assumed’ they would see and recognise me. The driver knows our vehicle.

After overtaking, as I pulled away, I checked my mirror and they seemed to be continuing to drive slowly along the side of the road. I assumed they would speed up.

I carried on… at 80 kph.

When I arrived at the turn-off point – there was still no sign of them – I stopped.

Now, I rant and rave against people using their mobile phones whilst driving; so I had purposed to neither initiate a call whilst driving, nor to answer any incoming calls. Stopped as I was now, I was still loath to ring the other van as they are most likely driving.

So, swallowing this, for me, rather bitter pill, I rang and the first question was “Are you still at the Security Control point?”

“Er, no, I was there very briefly, I am awaiting for you at the turnoff point”.

A few minutes later they roared up, and our convoy, now duly reconstituted, departed, me again leading the way to where the Syrian refugee encampments are situated.

We travelled up to Kırıkhan, and turn off the main road and headed towards the border. The encampment I had selected was not the first, but at a bit of a distance, but it was a good, all-round example of the encampments we deal with. Additionally, there is a real gaggle of children there and the visitors had purchased some sweets to give the children.

We call this encampment ‘The Grove’, not because there are trees in the encampment – there aren’t any – but because there is a grove of trees across the road from the make-shift encampment. This encampment is on a bit of a rise, and now, well into summer, baking hot. As I said, no trees within the encampment, everything is exposed to the unrelenting, scorching sun. Water at this particular encampment is provided by a water bowser which is topped up from time to time.

Sweets were happily received by the children.

After this encampment we swung by another encampment – but this was wholly redundant, and, as one of the visitors commented to me, “They all look alike”, to which he added, “You’ve seen one, you’ve seen them all,” – let the hearer understand, he was politely declaring ‘No need to show us anymore.’

We powered back to the main road – the other van turning right to carry on up the valley and then back to Diyarbakır. I turned left to return to Antakya.

It had been stressed to me that I needed to be back by 13:00 as the van was required. Today was a deferred time for the team to go to one of the encampments where we do a children’s work – their departure time was slated to be 13:00.

So, in one sense, I was racing the clock. When we departed we had three hours for me to complete the journey, there and back.  I thought this was easily adequate amount of time for the task. However, in fact, it was taking more than three hours to complete.

I did not exceed the speed limit, if I arrive late, I arrive late.

I was patient at all the red traffic lights.

I think I made a record for the number of red traffic lights I encountered on the return journey.

Being impatient at a red traffic light profits me not at all; being patient, however, and remaining calm, blood pressure abiding where it ought to be is both profitable, pleasant and absent of stress.

I had been told that if I was late, then they would take Ö’s vehicle – it would not be the best solution, but it was a viable and a ready solution.

My better-half, T, can monitor where in the world I am as I have ‘shared‘ my location via my phone with her. Hence, I hoped that they would have an idea where I was and, roughly, how long I would be.

Again, I had determined that I would not ring T whilst driving, and I would not answer the phone if it rang.

Driving the speed limit, waiting patiently at all the red lights, I arrived at our home about ten minutes later than their planned departure time.

Happily, my ever-changing location had been monitored; consequently they knew where I was and about when I would arrive.

They had opted to wait.

I didn’t park up; I just stopped in the street in front of our house – which given how narrow our street is, I effectively blocked the road. But I knew they would be departing posthaste.

Personally, I was done in… being diabetic, I can not play loose and free with my meal times. I had grabbed some bites of my sandwich whilst up the valley – only whilst stopped, not whilst driving.

Now at home, I finished my meagre meal.

Immediately after the meal was my first opportunity to practice the guitar this day, but after just ten minutes, the man for the central heating system arrived.

Now, I thought he would come, do his investigation, make his measurements, and calculate the cost all before I would depart for my guitar lesson, which was fully two hours after his arrival.

Indeed, I even entertained notions that I would have time to practice some before the lesson.

The man and his helper came and examined the space we had identified as a potential ‘furnace room’.

It is not ideal, but, well, it is the only space that could be remotely converted into a furnace room.

It took quite a while to determine where the chimney could go and then to decide where it would go. The chimney will begin on the ground floor, pass through a disused stairway which is covered and made into a wee balcony area on the first floor and then pass up through the roof and then, it will pass through our neighbours roof which overhangs ours. All in all, it is proposed to be eleven metres of plastered, cement block chimney, reinforced with angle iron.

Just to make things more interesting, this is on the side of the house that is subject to our neighbours rather disturbing subsidence….

After sorting the furnace room/chimney out, they came into our flat to measure for radiators, decide where they would go and how the various challenges identified could be and ultimately, would be addressed.

Then we went upstairs to the elder’s flat and did the same.

For me, the clear priority is the upstairs flat as my motivation in going to a furnace system was to alleviate the labour and work load of the elder’s wife, E.

In Turkey, if you have a wood/coal fired, pot-bellied stove, it is the lady of the house’s task to operate it (fuel, light, maintain, empty ash) – it is a cultural imperative and, really there are no practical alternatives.

But when it comes to furnaces, however, they are primarily a man’s responsibility – it is a big piece of equipment that needs a man’s touch.

Interestingly, emptying the ash is still the ladies task – but I have been sold on the idea of a wood-pellet furnace which produces very little and very light ash – or so we have been assured. So the labour requirements for the elder’s wife will be greatly diminished – which is the goal.

Then, over a demitasse of strong Turkish coffee, he did his sums.

I, as seems to be my nature, complicated things.

I wanted a sum with the second-hand furnace, a sum with a new furnace, and a sum with the top of the line, fully automatic furnace.

I also wanted a sum calculated without doing the radiators in our lower flat, in an effort to save money.

However, this last request is extremely strange and a rather odd kind of request for Turks, and in the end, it seems, he just ignored it.

We got our prices.

We drank our Turkish coffee.

I buzzed with the effects of the potent caffeine hit.

I had been surreptitiously monitoring E.’s location (she has shared her location on her phone) and I knew they were well on their way back from the children’s work.

Before we were done, she arrived, and so, we began explaining everything we had determined, what could be done and what we suggest should be done – if we decide to have a system installed.

Then the elder, H, arrived from his secular job.

So, we began explaining everything to him.

It was in the midst of rehearsing all the salient facts, problems, compromises and solutions that my guitar teacher rang, wondering where on earth I was… because I clearly was not at my lesson…

Time had totally escaped me.

Profuse apologies, following profuse apologies… things really are not going according to any plan that I am part of today.

In the end we finished all our explainations.

We need to inform the central heating man by the morrow if we want to install any system and especially if we desire the second-hand furnace.

Today, nothing went to plan and I was bounced from pillar to post by various events…

But, life is like that… we constantly need to respond to events, assess, appraise, decide what we can and should do in the circumstance and all the while, to be true to who we are and our principles.

Just how do you do that…

In the old section of Antakya, the pathways and byways are convoluted, narrow and, at times, rather Byzantine.  Many are impassible by any form of motorised transport.

And so the question arises: “How does the city council provide the basic services necessary in the 21st century?”

The solution is found inthe time honoured, tried and tested method of accessing and servicing these areas – let me introduce you to the city council donkey.

These determined, strong and dour creatures can navigate the narrow ways, and when you come to the houses pearched on the mountainside, they can climb the rough stairs and can reach all the properties situated there.

Of course you do not send out the donkey on its own, it is accompanied by and lead by the Council ‘donkeyman’.  Maybe that is not his title, but it does describe what he does.

Teams of men and their donkeys go out every night, collecting the trash and detritus of life set out in front of the dwellings in this, the old quarter of the city.

The rest of the city is serviced by your typical rubbish lorries – but here, in the old city, the new has had to give way to the old.

The technology of yesterday is helping to maintain the standards of today.


 

Culture – No 1

Ah, the mystery and the power of culture.

Culture is difficult to define because, well, it is ‘culturally defined’.

Culture is, I believe, a gift from God.  It relieves us from many mundane decisions in life.  We just ‘know’ what is acceptable and what is not… without thinking.

People sometimes query me on some aspects of Turkish culture:

“Why must you uncross your legs when you pray?”

“Why are crossed legs inappropriate?”

“Why is blowing your nose in public profoundly rude and offensive?”

“Why, when I have a cold, is it acceptable, a non-event, to continuously sniff, sniff, sniff?”

The simple answer, is “that is the Turkish, (cultural), way”.  But so often people are reticent to comply until they understand the ‘why’ and even then, I suspect that if the reason is not convincing enough, that they will feel free to reject the prevailing culture, opting, interestingly, for their own cultural norm.

Culture, generally, by-passes our conscious minds.  It is behaviour and values that we have learned as children and have become embedded in our hearts and minds.  They are not the result of reasoned thinking, deduction or conscious decisions.  They are, if you will, subconsciously inherited.

And they are powerful.

Culture is extremely persuasive and operating as it does underneath our conscious mind, the result is that we are more often than not, blissfully unaware of its very existence and yet all the while living according to its dictates.

For an inadequate example: if someone asks me what time it is, my natural answer will be a precise: “It is 10:36”.  My culture calls for and honours accuracy.

And then I come to this culture that seems to paint ‘word pictures’ that describe the scene, and include ancillary information but tend to be woefully inaccurate.

To the question of what time is it, the respondent, feeling it is late in the day and time is flying by, may well respond “It is 11:00” or if they feel there is much of the morning left, they may reply “It is 10:00”.  Broad-brush accurate, but patently and profoundly fuzzy and, well, inaccurate – after all it is 10:36 exactly.

So, when I ask a question, I prepare my heart for a non-accurate ‘word picture’ which both answers the question (generally) and gives an insight to the speakers feelings about it.

Now, when I am asked a question, my culture demands, requires me to answer ‘specifically and accurately’.  That is the way my culture was formed and it has an inescapable influence over me.  My reply will be highly accurate and utterly devoid of any emotional content, that part which gives a hint of how I feel about it.

Do I communicate?  Yes, but after a fashion.

Do I understand?  Yes, but there are times of frustration and struggle as I am stumbled by the patently obvious inaccuracies declared.  For the speaker, they are not ‘inaccuracies’ but the part that declares their feelings about their answer.

If smartphones are so smart….

I have a question: “If smartphones are so smart, why do people act so, well, simply put, ‘dumb’ when they are using their smartphone?”

Since the advent of the smartphone, simple life tasks, like walking, talking, interacting, driving have all become more intractable and fraught with danger and difficulty.
It is uncomfortably common that when I am out, driving somewhere and I encounter a vehicle being driven in an erratic, unpredictable, inattentive, distracted manner – slower than other traffic, drifting one way or another, stopping at profoundly inappropriate places, it is most likely that they are engaged on a smartphone.

Recently I watched a video on Facebook whereby the driver of an intercity coach was engaged on a smartphone – regrettably not uncommon – but what stood out was the fact that he was looking something up on his second smartphone; all whilst charged with the safety of all souls on board as he ‘drove’ the coach down the motorway.

Even a mundane task such as walking down the pavement can be fraught with hitherto unknown challenges. You often encounter an individual who is walking slowly, apparently unaware of where they are, where they are going and yet they are not stationary but are walking – after a fashion. They are going somewhere, and they have a phone glued to their ear, or are head down, intently staring at the screen of their smartphone.

Motorcycles are used to move a vast array of things about. Sometimes they are over-loaded with goods or people. But, just to make things more, er, interesting, often the motorcycle operator will have pushed his smartphone up between his helmet and his head so he can engage in a conversation whilst driving his over-laden, motorcycle in traffic. This is the ‘positive scenario’.  You will also witness others who do not have the benefit of a helmet, holding the smartphone in place, so they have one less hand on the steering apparatus.

This is true for those who move about by bicycle as well.

Another phenomenon that is observed, again with great frequency, is the sight of two, three or more people, physically in the same room, be it a sitting room, a restaurant, anywhere basically, and each one, head down, intently transfixed on the small screen held possessively in their hands. Maybe they are ‘Messaging’ one another, or are Facebooking their exciting time to others on the web, or writing up a blog on their encounter with their friends – I do not know.

However, it seems self-evident that they could perform the same level of human interaction if they were in separate locales as much as being together.

Sad doesn’t begin to describe it, and yet, I, too, can succumb to the temptation to check my phone.

I find it rather ironic, bizarre, that the thing that routinely reduces mankind to a distracted, dangerous, wandering, discourteous, individual, behaving in a dumb state, is the use of the so-named ‘smartphone’.

While on my morning constitutional…

On my morning constitutional, I noticed that in spite of it being a significant holiday in Turkey, the water company was out with a JCB and parts and things.  

It seems there was a water leak.  

As I continue my walk, I came past the bottom of the hill below where the JCB was parked and noted that there was a large quantity of water freely flowing down from the leak – a good thing they are working to make things right, even on a holiday. 

The next day, there was just a gravelly spot on the road to declare where the leak had been. The hill was liberally decorated with dirt and dried mud from the overflow.

On the following day, I am sitting in a wee coffee shop at the bottom of the hill when I see horizontal water spray flying down the hill.

Now this caught my attention.

Slowly a Fire appliance came into view; a tanker truck – it carts the water to accompany the other fire fighting appliances and ensures a constant source of water.

Today, in service to the local council, they were slowly driving down the hill spraying the road with a set of high pressure water nozzles at the front of the lorry.

Slowly coming down the hill, they drove all the dirt, dust, stones before them. The roadway is left free of debris; clean and spotless.

The appliance then stopped in front of the coffee shop and released a fire hose. With this the two firefighters began spraying the street, driving the accumulated dirt, mud and stones along the road and towards the storm drain.

They cleaned in front of the coffee shop, they cleaned the pavement in front of the shop. They sprayed, with diminished force, the ten or so planters full of colourful flowers in front of the coffee shop.

They were diligent, hard working, pressing on to make all clean and ship-shape.

I found the process reminiscent of the circle of life. They were called out because of a water leak which had besmirched the roadway. They cleaned the road by driving the muddy, soil laden water into the water drains; where, in the fullness of time, they will become clogged requiring a crew to come out and clear the drain, soiling the street which will require the Fire Brigade to once again come and clean the street.

And after all this diligent, hard work… the two firefighters (er, street cleaners?) came into the coffee shop for their full Turkish breakfast          

The street is clean… until the drain needs to be cleared… and then the cycle will repeat itself.

No action, no activity seems to occur in isolation.  

Actions need to be seen, to be assessed, in their context. The activity that I am about to engage in: what are the natural repercussions; what will naturally result; what are the responsibilities; what are the consequences.

Hmm, I need to bear that in mind…